Advanced carbon fiber conductor (ACCC)
Capable of carrying twice the electricity and installed in one-third of the time and at one-third of the cost of conventional cables.
ETARE is for you and for every Venezuelan. Our purpose is to restore reliable electricity service, improve our quality of life, and reactivate our industry.
The project is fast track and will eliminate the bottlenecks in the supply of electricity to the residents of Venezuela who need power so urgently.


Three components proven in the United States, China, and Europe, now available for Venezuela: (1) advanced carbon fiber cables; (2) large-scale utility storage batteries; and (3) AI-driven control systems for the smart power grid.
Capable of carrying twice the electricity and installed in one-third of the time and at one-third of the cost of conventional cables.
Massive batteries that have become a standard component of the electricity supply grids in the United States, China, and Europe.
AI models running 24/7 on top of existing applications such as SCADA, detecting faults before they cascade and reducing blackouts by 15–20%.
ETARE is a company established to assist the Government of Venezuela to improve the electricity supply through the use of advanced modern technology. It was founded by some of the most senior and experienced Venezuelan engineers in the global energy sector.
Learn in detail about the plan, the technologies, and the team behind the accelerated recovery of the Venezuelan electric grid.
Download project profile (PDF)